NEW PLANT ROOM

Design and Installation at a well known chocolate manufacturer.

IMG_0250_edited.jpg

CONCEPTUAL DESIGN

The Correct Partners

Our services are customised to meet the specific needs of each client. We work collaboratively with a number of close partner companies throughout the entire process.


In this instance we worked with Alway of Loughborough for the final design.

IMG_0247_edited.jpg

PLANNING & IMPLEMENTATION

A Comprehensive Approach

We bring the project or idea to life. Since founding the business, we have provided our clients with a wide range of contractor and project management services facilitating builds, such as this one.


Clifford Construction (Norfolk) preparing the pile caps and beams

IMG_20200121_110109_edited.jpg

END TO END PROJECT MANAGEMENT

Expert Guidance

Our clients are our number one priority, and the services we provide prove just how committed we are to their success.

Again working with Alway of Loughborough through the implementation, getting ready for the installation of the piped services to the adjoining factory by Hilton Process Solutions of Elland.

 

EFFLUENT PLANT - MOVE AND IMPROVE

Design and Installation completely managed by WSP Engineering

IMG_20190617_145445.jpg

REALISING THE MOST FROM EXISTING EQUIPMENT

Design and Preparation

The design is completed for each individual project. The preparation of the footings and all the services for the effluent plant move was completed well in advance of the long weekend allocated for the lift and shift operation.

In this instance we worked with Clifford Construction (Norfolk), Hilton Process Solutions of Elland and WA Cooke for the final design of the infrastructure and processes.

IMG_20190621_174316.jpg

LAYOUT AND ERGONOMICS

A Comprehensive Approach

We bring the project or idea to life. Since founding the business, we have provided our clients with a wide range of contractor and project management services facilitating builds, such as this one.


WA Cooke and WSP Engineering completing the equipment moves.

IMG_20191218_150033.jpg

THE FINISHED ARTICLE

Operational 

The fully functioning system, working to provide a massive reduction in discharged COD, FOGs and solids, that fall way within the sites consent levels.

Alway of Loughborough providing the building with the installation of the piped services to and from the factory by Hilton Process Solutions of Elland.